University question of unit wise 2 marks and 16 marks
questions were repeatedly asking by the Anna University, Chennai for the
subject process planning and cost estimation. This is one of the elective
subjects for the students of Mechanical engineering studying VII semester. Take
for your reference and get more marks in university examinations.
B.E/B.Tech Degree Examinations April/May
2013
Anna University, Chennai
Department of Mechanical Engineering
ME2027
Process Planning and Cost Estimation
Seventh Semester
Regulation 2008/2010
PART-A (10*2=20
marks)
1. What is SIMO chart?
2. Define rating.
3. List the information requires
for process planning.
4. What are the two approaches
to process planning?
5. Define costing.
6. What is meant by direct
material? Give an example.
7. Mention any two functions of
cost estimation.
8. What do you meant by a
realistic estimate?
9. What is meant by direct
labor cost?
10. What is fatigue allowance?
PART-B
(5*16=80 marks)
11.(a)
(i) What are the steps followed for doing a method study of job process? (8)
(ii)
Write procedure of time study. (8)
Or
(b) (i) What is the purpose of work measurement?
Enumerate its uses. (8)
(ii)
Discuss the tools are techniques for work measurement. (8)
12. (a)
Explain the technological frame work of process planning by using a block
diagram. (16)
Or
(b) (i) Write the process planning
procedure. (8)
(ii)
What are the factors to be considered in machine selection? (8)
13. (a) (i)
Discuss the various methods of costing. (16)
Or
(b) (i) Name the various elements of cost.
Explain each element in detail. (16)
14. (a) (i)
What are the components of a job estimate? Explain. (16)
Or
(b) (i) What are the types of
estimator. (8)
(ii)
Differentiate between estimating and costing. (8)
15. (a) Explain
the various time allowances which should be considered for calculating labor
cost. (16)
Or
(b) Explain the procedure followed for
estimating the cost of an industrial product. (16)
B.E/B.Tech Degree Examinations April/May
2015
Anna University, Chennai
Department of Mechanical Engineering
ME2027
Process Planning and Cost Estimation
Seventh Semester
Regulation 2008/2010
PART-A (10*2=20
marks)
1. What is
meant by method study?
2. Define
standard time.
3. What are the
types of process planning?
4. List the
information required for process planning?
5. Define cost
accounting.
6. Write any
two objectives of cost estimation.
7. What is
batch costing?
8. Define
standard data.
9. What is
meant by overhead expenses?
10. Define
cutting speed.
PART-B
(5*16=80 marks)
11. (a) With examples explain the objectives of
work study. (16)
Or
(b) Discuss the various tools and
techniques used for work measurement. (16)
12. (a) Explain the process planning procedure.
(16)
Or
(b) Describe the various types of charts and diagrams used in
process planning. (16)
13. (a)
Name the various elements of cost. Explain each element in detail giving
suitable examples. (16)
Or
(b)
Write down the step by step procedure for estimating the direct material
cost. (16)
14. (a)
What are the types of estimates? Explain with examples. (16)
Or
(b)
Explain various allowances to be considered in estimation of direct labor cost.
(16)
15. (a)
A 60 mm rod of aluminum to be machined on a lathe, the finished size is shown
in fig. The length of rod is 175 mm. Determine the total machining time and
material cost, if material is purchased at the rate of Rs 12 per Kg. Assuming
cutting speed 30 m/min and feed 0.2 mm/rev. Take density of aluminum as 2.7
gm/cc. Depth of cut not to exceed 2.5 mm. (16)
Or
(b)
Describe the procedure of estimating the machining time required during shaping
operation of a shaper. (16)
No comments:
Post a Comment